Trail Crew - trail work at Three Bridges

November 4, 2021

The Trail Crew was able to perform some trail maintenance after the first rain softened the dirt.  The crew reshaped some small sections of tread on the western portion of the Oak Woodland Trail.  The tread had become uneven between the upper and lower edges.  The crew reshaped the trail using their trail tools (pick mattock and McLeod).

The crew also covered up an area where a few users were cutting the trail between the switchbacks.  They used some of the large fallen oak tree that was located farther up the trail.

As we get more rain, the crew will be out more to make sure the trail stays in good shape!

Trail has been reshaped and the outer edge covered. 

Brush placed over the shortcut.

« Back to News