Trail Crew - Repair of Drainage

March 9, 2023

The Trail Crew did a great job of repairing a section of trail that was eroded during the big storms so far this year.  The erosion occurred at the 2nd drainage below the bridge in two adjacent areas.

The crew worked hard to harvest rocks from the hillside and move them to the eroded locations.  Other crew members then stacked and locked the rocks together in order to stablize the trail edge.  The repair worked very well during the following rains.

Repairs made to the eroded drainage  

« Back to News